top of page

​

SNAGSHOT NORTH WEST

AFFORADLE PRICES

​

A FULL COMPREHENSIVE LIST OF DEFECTS

​

QUALITY SNAG SURVEY

​

MAKE A BOOKING WITH US ON A DATE TO SUIT BOTH PARTIES

A QUALITY SNAG SURVEY WILL BE PERFORMED AT THE PROPERTY BOOKED

A DETAILED QUALITY SNAG REPORT WILL BE GENERATED AND SENT TO YOU

ABOUT US

Hello let me introduce myself, I am a multi award winning senior site manger with over 30 years worth of experience in the new build industry. I  am passionate about producing a quality home which is a fundamental reason behind starting SNAGSHOT. I have all the experience required to check if your new build property has been constructed to comply with NHBC/LABC building regulations whilst also checking that minor defects are within tolerance 

​

When is the best time ?

​

The new build snagging period is two years, where the developer must fix any snags/defects reported within those timescales. Ideally the snagging survey should be done prior to the occupation to ensure any defects found are not attributed to damage caused after occupation rather than poor workmanship.

​

​

​

MOBILE

 07890720750

EMAIL 

FACEBOOK

OVER 30 YEARS EXPERIENCE

AFFOARDABLE RATES THAT WON'T BREAK THE BANK

​

​

​

  • Facebook

© 2035 by Dr. Repair. Powered and secured by Wix

bottom of page